Industrial Chemicals, London, UK
Industrial Chemicals contracted SBS Ayrshire to dismantle a redundant chemical plant. This was challenging due to surrounding environment on a top tier COMAH site.
Every part of the plant was required to be cut into small manageable pieces and lowered to the ground as anything falling from the plant could have had catastrophic consequences. This project lasted around 4 months.