SBS were employed as the principal contractor to disconnect and remove all equipment from a dairy factory which was no longer in operation.
Before removing any equipment, we conducted a thorough assessment of the dairy facility and the equipment to be removed.
The owners of the site ensured that the equipment was disconnected from power sources, water supply, and any other relevant utilities to ensure safe removal.
The project took around 3 months from beginning to completion, including some rebuilding work to ensure the factory was in good condition to hand back to the owners.
All of the equipment was removed in a safe and timely fashion then loaded to transport, also arranged by SBS, to be delivered to the new destination.