Steel Production Plant immediately available,

Location:

Description

Steel Production Plant immediately available , replacement cost in excess of $2 billion dollars. Equipment will require extensive refurbishment but can be purchased “as is where is” for $ 120-150 million dollars. Offers will be considered for major sections of this project. STS 4 Strand Billet Caster (YOM 2008) • Mannesmann Demag thin slab caster and hot strip mill (YOM 1998) • Nippon Steel Corporation 150T Ladle furnace (YOM 1998) • Rokop 5 Strand billet caster (YOM 1995) • UBE Industries 700,000 T/A hot skin pass mill (YOM 1998) • 2.5MT/A Pelletisation plant comprising: • 2x Vai Fuchs 80T electric arc furnace (YOM 2000) • 3x Inducotherm 30T induction furnace (YOM 2008) • 5x Sulzer 10.56MW gen sets (YOM 1994) • 6x Wartsila 10.51MW gen sets (YOM 1997) • 10x Overhead cranes by Hyundai, Samjung & Bando 12T – 110T

Specifications

ConditionUsed